Case Study
This crane is used to support the latest construction methodology with its ability to lift substantial components such as large steel frames and modular assemblies to height on major high-rise projects, and is currently being utilised on the 122 Leadenhall project in London. Can be climbed internally or externally as the structure’s height increases.