Client: Everton Stadium Development Ltd

Type: Sporting Arena

Location: Liverpool

Status: Live

Service: Modular Accommodation

  • 110 unit modular accommodation to provide facilities for 1110 staff and site workers
  • 52,888 seater stadium

Case Study

Select’s Innovative 110-Bay Modular Building Transforms Everton Stadium Project at Bramley-Moore Dock

As part of the visionary Everton Stadium development at Bramley-Moore Dock, Select has manufactured and installed an innovative 110-bay modular building to support the extensive project. This four-storey, state-of-the-art facility, prominently visible from Regent Road, was meticulously designed and constructed at Select's manufacturing facility in Wincham, Cheshire, a mere 30 miles from the project site, enabling rapid deployment and installation. Once the modules arrived on site, Select’s expert lifting team assembled the structure in just nine days, completing the entire build in record time—an impressive four weeks from delivery to handover.

Sustainability at the Core: Advanced Energy Efficiency and Green Technology

The modular building exemplifies Select’s commitment to sustainability and energy efficiency. Key features include:

  • Enhanced Insulation and Thermal Windows: Improved insulation and high-performance windows optimise thermal efficiency, significantly reducing energy demands.
  • Smart Energy Sensors and LED Lighting: Energy-saving sensors and LED lighting throughout the facility contribute to a greener, lower-energy footprint.
  • Air-Source Heat Pumps: An innovative air-source heat pump system captures excess heat from the drying room, repurposing it to heat water for the building’s showers, resulting in a certified A-rated energy performance.

These eco-friendly technologies have transformed the building into an energy-efficient, sustainable space tailored for modern, large-scale construction projects.

A Purpose-Built Space for Productivity and Wellbeing

Designed to accommodate the project’s 1,100-person workforce, the new modular complex offers bright, spacious, and modern facilities:

  • Open-Plan Offices and Kitchen Areas: Enhanced workspaces that encourage collaboration and provide employees with amenities to prepare meals.
  • Comprehensive Welfare Facilities: Including changing rooms, toilets, a canteen, and dedicated well-being and contemplation spaces.
  • Additional Features: The facility includes a passenger lift, expansive drying facilities, and a top-floor gallery with panoramic views of the River Mersey, offering a unique vantage point for employees.

These thoughtfully designed features contribute to a more comfortable and productive environment, supporting both work and well-being for all team members.

Essential Support for the Everton Stadium Project

In addition to the modular building, Select is supplying essential equipment to the Everton Stadium project. The deployment includes four tower cranes and several crawler cranes, critical to the assembly of the stadium’s structural frame. With its cutting-edge modular building and robust support equipment, Select is driving operational efficiency and sustainability, helping to bring Everton’s stadium vision to life.

110

Modular bays

4

Storey modular building

1100

Office and site workers utilising the facility